The project covered complete rehabilitation works of 2x3.75 MW hydro power generators at Polpitiya Station by replacing all major equipment such as generators, turbines, main inlet valves, penstock guard valves, control system and fire deluge system with the objective of achieving overall efficiency increased by 15% and improving reliability.